Deliverables 74 deliverables (public or confidential) will be produced over this 4-year project. All public deliverables will be available for download below. WP 1: Project Management D1.1 Quality Assurance plan & Project management Handbook D1.2 Data management plan WP 2: System Design and On-Site Integration D2.1 Cycle designs and preliminary component specifications D2.2 Process & Instrumentation Diagram (P&ID) and 3D arrangement WP 3: Monitoring Optimization D3.1 Cumulative report on selection of sensors and definition of test matrices D3.2 Experimental data post-processing methods WP 4: Development of a 2 MW hermetic turbogenerator D4.1 Report on design of hermetic turbogenerator WP 5: Heat exchangers and thermal storage D5.1 Report on design of heat recovery system, recuperator, condenser, and thermal storage WP 6: Demonstrator, Work Preparation, Erection & Operation D6.1 Engineering studies reports, authorizations & permits granted D6.2 Funding agreement and commercial contract framework D6.3 Final Performance Test & Quality Report WP 7: Technical, economic and environmental assessment D7.1 Selected industrial sectors for replication studies D7.2 Economic & environmental impact assessment report D7.3 Technical assessment of performance results of the demonstrated solution, model validation and replication WP 8: Impact assessment for enabling exploitation of the new ORC solution D8.1 Plan for exploitation of the project results D8.2 Technical, regulatory and market aspects D8.3 ORC potential and impact in various sectors D8.4 Business plan and roadmap for market uptake WP 9: Dissemination, communication and stakeholder engagement D9.1 Plan for the Exploitation and Dissemination of Results D9.2 Final report on exploitation and dissemination actions and post-project strategy